Industrial


Strata Batch Plant
Owner: Strata Corporation
Scheduled Completion: November 2007

Design-Build construction of a ready mix batch plant facility.  The project also includes vehicle storage and office space for operations in the Devils Lake region.




Heartland Grain Fuels 40mgy Ethanol Plant
Owner: Heartland Grain Fuels, LP
Scheduled Completion: October 2007

General Construction of multiple building concrete foundations and floors, and multiple concrete structures.  Process equipment setting and installation.


Grand Forks Levees
Owner: U.S. Army Corps of Engineers
May 2004 - April 2007

General construction for Phase 3 includes 2000 ft of concrete floodwall, multiple closure structures, pump stations, sheet pile outfall structures, dirt work, detention ponds, bituminous bike trails and restroom structures. 



Northwood Mills Soybean Crushing Facility
Owner:  Northwood Mills
Completed January 2007

Design-build construction of a 15,000sf soybean crushing facility.  Insulated site cast tilt-up concrete wall panels total 45 ft high.  Additional cast in place and pre-cast concrete components are all part of this food-grade production facility.


North Hill Replacement Reservoir
Owner:  City of Minot
Completed July 2006

General construction of a four million gallon reservoir.  Work consisted of demolition of an existing reservoir, and construction of a new facility.  Site cast concrete foundations, floor, and walls, combined with an aluminum geodesic dome and several pumping systems completed the project


Raw Water Intake & Transmission Pipelines
Owner:  City of Grand Forks
Completed October 2002 (Phase I)
Completed September 2004 (Phase II)

Construction of a 60-foot inside diameter circular concrete caisson with a finished floor elevation that is approximately 65 feet below the existing ground surface having an augered grout-injected pile foundation system tied to a substantial concrete base slab.  Installation of two 30-inch and one 36-inch steel raw water transmission pipelines having a total length of approximately 7,300 feet using horizontal directional drilling (HDD).  Construction of one new river inlet assembly and pipeline connections to two existing river inlet assemblies.


Clearwell & Pumping Station
Owner:  City of Grand Forks
Completed October 2003

Construction of a new 7 million gallon clearwell and high service pumping station.  Improvements to the existing high service pump system are to be constructed within and adjoining  the existing water treatment plant.  Major components of the project include: One new high service pumping station structure; one new 7 million gallon clearwell; site and process pipe ranging from 4-inch to 48-inch in diameter; four new high service pumps and associated equipment; chlorine and ammonia disinfection feed equipment & associated monitoring equipment; one emergency standby generator and diesel fuel tank system; removal of four existing high service pumps and installation of three new transfer pumps; one new triplex booster pump system and associated appurtenances; mechanical and HVAC equipment; and electrical and instrumentation.



Waste Water Treatment Plant

Owner: City of Grand Forks
Completed January 2003

Membrane roofing for main & distribution buildings, metal stud walls, architectural finish work, outside insulation & fiberglass siding, doors, windows, elevator & overhead crane.



Baldhill Dam Pool Raise, Stage 1
Owner:  US Army Corps of Engineers
Completed November 2001

Fabrication and installation of 3 new tainter gates.  Work includes concrete drilling and post tensioned anchor installation, concrete placement to raise portions of two abutments and two piers, removing and installing existing tainter gate hoists and removing old tainter gates.



Solid Waste Bailing Facility
Owner:  City of Grand Forks
Completed July 2000

Site grading, construction of site access roads and parking areas, extending/installing site utilities and storm drainage structures, procuring and constructing a 160 x 200 ft precast concrete building, including foundation system and procuring/installing truck scale system and scale house.



South Central Business District
Parking Ramp

Owner:  Grand Forks County
Completed June 2000

General construction of a three level parking ramp with 346 parking spaces.



Corporate Center Parking Ramp
Owner:  City of Grand Forks
Completed December 1999

General construction of a four story parking ramp, including site cast and pre-cast building components.