Commercial
Pumpco Office and Warehouse
Owner: Pumpco Energy Services
Scheduled Completion: July 2009
Design-Build construction of a 56,000 SF PEMB office and warehouse facility to be located on 22 acres in the Great Plains Energy Park in Minot, ND.
Warehouse Addition
Owner: North Dakota Mill
Scheduled Completion: Fall 2008
General Construction of a 30,000 SF addition to the warehouse and storage facility at the North Dakota Mill.

Aurora Hospital
Owner: Aurora Hospital
Scheduled Completion: January 2009
Design-Build construction of a tilt-up concrete building shell for a 92,000sf two story hospital facility. The exterior concrete wall panels for this facility will feature a thin brick inlay system, synthetic stucco system, and texture paint.
Altru Cancer Center
Owner: Altru Health System
Scheduled completion: January 2009
General construction and remodel of 14,050sf on the lower level and 7,786sf on the main level. Over the next 18 months, an addition of 6,040sf will be added to the main and lower levels. Over 5,000sf of the existing main level space will be remodeled.
Urban
Owner: Urban Plains Medical Park
On-going Tenant Improvements
Design-build tilt-up construction of a two-story 40,000sf medical office facility. Independent medical service providers will occupy the facility and operate in individual office space while sharing common areas. This is the first building in a series of 6 to be located in the park.
Jodsaas Center Addition
Owner: UND
Scheduled Completion: August 2008
Design-Build construction of a 2 story, 14,000 SF addition to the School of Engineering and Mines on the campus of the University of North Dakota.
President’s Residence
Owner: UND Alumni Association
Scheduled Completion: July 2008
Design-Build construction of a 5,200 SF residence on the campus of the University of North Dakota.
UND Student Housing
Owner: University of North Dakota
Completed: August 2007
General construction of a 108,000sf multistory student housing facility. This project will add nearly 300 beds to the student housing mix at UND. Suite style units with individual living quarters connected to a common living spaces provide for a modern option to on campus living.
Hopper-Danley Memorial Spiritual Center
Owner: UND Alumni Association
Completed May 2007
Design-Build Construction of a 2,400sf meditation and spiritual center.
Grand Forks County Correctional Center
Owner: Grand Forks County
Completed August 2006
General construction of a 90,000sf, 220 bed correctional facility. The state of the art facility has two booking systems, a multi lane sally port, three recreation centers, library, commissary, and a video court system.
Aurora Medical Park
Owner: Stadter Center
Completed Spring 2006
Design-Build construction of a tilt-up concrete building shell for a 108,000sf, two-story medical office building. The exterior concrete wall panels of this building feature a thin-brick inlay system and synthetic stucco systems.
Ina Mae Rude Entrepreneur Center
Owner: Center for Innovation Foundation
Completed January 2005
General construction of a 22,000 sf state-of-the-art facility on the campus of UND. This facility provides office space, meeting rooms, research labs, and board rooms for developing companies, as well as student entrepreneurs.
Warroad Public Safety and DNR Facility
Owner: City of Warroad
Completed August 2005
General construction of a 30,000sf joint use facility housing the City of Warroad's Police, EMS, and Fire Departments as well as the Minnesota DNR Area Headquarters for Forestry and Enforcement operations. The building accommodates vehicle storage and service, meeting and training rooms, emergency operations center and agency office facilities.
FedEx Ground Facility
Owner: FedEx
Completed October 2005
Design-Build construction of a 26,000sf ground distribution facility. The building consists of office, warehouse, and distribution space.
James C. Ray Hangar Facility
Owner: UND Aerospace
Completed January 2004
General construction of a state of the art aircraft hangar and service facility totaling 22,000sf. The building consists of office space, repair and service bays, and climate controlled aircraft storage.
Gordman's Retail Store
Owner: Gordmans
Completed February 2001
Design-Build construction of a 55,000sf retail store including site cast tilt-up concrete walls.
Grand Forks Marketplace
Owner: Oppidan
Completed August 2001
General construction of a combined total of a 96,000sf, 12 tenant retail complex. Tenants include Old Navy, Michael's, Bed Bath and Beyond, Hallmark, Famous Footwear, Catherine's, and Fashion Bug.
East Grand Forks City Hall
Owner: City of East Grand Forks, MN
Completed October 2001
General construction for a 50,000sf two-story City Hall. Building consists of a dome lobby and entrance and administrative office for local government.
Corporate Center
Owner: City of Grand Forks
Completed January 2000
General construction of tenant improvements for a 94,200sf multi-story office complex. Tenants include Alerus Financial, Brady Martz and others.
Phoenix Elementary School
Owner: Grand Forks Public Schools
Completed October 1998
General construction of an elementary school, featuring an administration center, gymnasium, commons, classroom wings, and the media center which houses the computer center, reading rooms, and the school's central book collection.
